| 2017 | 2 & 3 Pipeline Demolition Work | 2017 | 2 & 3 Steam Gear & Chimney Assembly Work | 2016 | Within the scope of the new facility investment Aksaray Factory; Manufacture & montage and insulation construction projects of complex supply systems of Chiller, Back, Cheek, Filler, Wa Mill, Gum Kalender, Dieman Office, Sheath Preset, Cross Cutting, Heel Filling, Rubber Manufacturing, Textile Calender, Painting and Coated Cloth Slicing Machines ~ 5,000 m) | 2007-2015 | Machinery maintenance work, tank and pipeline overhaul and maintenance work | 2015 | Za-zb new press branches with press channels, academy cooling tower erection, disassembly and erection of G1-G2 presses displacement works | 2014 | Za-Zb new press branches with press channel, dismantling and erection of fire line behind boiler house | 2013-2015 | Z07 cable train modification | 2013 | U line hydraulic group construction 9 sets, Zf8-9 press group after boring | 2012 | Replacement of boiler room compressors and lines with stainless steel pipes, modification of fab2 press end pump pit, manufacture and installation of mixer 9 pipelines, installation of chiller system, heating undercuts on aparey lines, vacuum curling press piping works |
|
| 2005-2015 | Machine assemblies, compressed air lines, roof manufacturing and assembly | 2013 | B460 front bumper stand manufacturing | 2012 | Moving the V 347 assembly line, Moving the V227 line, Modifying the Ford complex chiller lines |
|
| 2006-2010 | Steel construction, tank manufacturing, boring and insulation works |
|
| 2008 | Power plant chimneys natural gas cycle overhaul and insulation works, hot oil boilers, boiler pail revisions and insulations |
|
| 2016 | Cooling Tower installation and cooling water installation works | 2015 | Installation of Kurtköy factory to Taysad factory, manufacture and installation of Tekpol partition wall | 2014 | Manufacture of battery charging chamber | 2013 | Manufacture of Pentan tanks 30 m³ | 2012 | Crystallization tower manufacturing |
|
| 20164-2015 | Thickness measurement work of tank |
|
| 2016 | Manufacture and installation of pipe heat exchanger | 2014 | New T25 12 "dow feeder line, steel construction, support manufacture and erection |
|
| 2016 | | | Dismantling Project of Naphtha and Fuel Oil Lines by Cold Cutting Meth |
|
| 2016 | Joint Installation, Infrastructure Installation, VRF Air Conditioning Installation, Ventilation Installation Work |
|
| 2016-2017 | İzmit Refinery General Pipe and Steel Construction Works |
|
| 2016 | Projecting, Manufacturing and Assembly of Retanning System Used in Paper Fabric |
|