| 2009-2008 | Manufacture and installation of water purification systems complex pipe and steel construction |
|
| 2011-2015 | Factory wide maintenance and repair work | 2015 | Reverse osmosis plant piping work | 2014 | Caustic tank heating system modification | 2006-2011 | Manufacture and installation of pipe manufacturing machines, instrument and installation manufacturing and assembly, manufacturing and assembly of fine oil baths, manufacturing and assembly of machine parts |
|
| 2007 | Manufacture and erection of pipe bridge at Arıtma plant, manufacture and erection of hydrogen and nitrogen tanks. |
|
| 2015 | Manufacture and installation of neutralization tank in purification unit | 2013 | M140 extractor fan construction and balance adjustment | 2011-2013 | M140 2 upper group cooling coil production 8 units, m140 1 upper group cooling coil, 8 production units, phosphate bath exchanger manufacturing | 2012 | Mk150 Serpentine manufacture | 2011 | Manufacture and installation of filters for burner suction fans, M140 1 subgroup cooling coil production 16 peice |
|
| 2016 | Power plant turbine case, main case, inlet pipe manufacturing |
|
| 2016 | Various mechanical installation and maintenance works | 2014 | Dalaman factory pipeline renovations, mechanical assembly works |
|
| 2015-2016 | Mechanical maintenance work |
|
| 2016-2017 | Installation of equipment under capacity increase, Renewing of starch lines, Construction of electrical works | 2016 | Reject Drum Steel Construction and Pulper Clean Platform Manufacturing and Assembly | 2015-2016 | Mechanical maintenance work | 2014-2015 | Mechanical maintenance and renovation work, dismantling and assembly of stainless steel pipes |
|
| 2013 | Within the scope of capacity increase; Factory general mechanical maintenance work, OSG coverage mechanical works, conveying cellrollers maintenance of bearing bearings, rope propulsion system and maintenance of threaded couplings, change of shell boiler wheels 18 pcs. Assembly of blind valve vibration sensors stainless pipe modifications | 2012 | Within the scope of the capacity increase, the exchange of factory general pipelines | 2011 | Manufacturing and installation of factory general piping works | 2010 | Screw manufacturing and machining |
|
| 2016 | Manisa factory mechanical maintenance and technological pipe fitting | 2011-2015 | Factory general mechanical maintenance work | 2013 | Within the scope of capacity increase; Steam condensate system and ventilation line modifications |
|
| 2010-2015 | Mechanical maintenance work |
|
| 2016 | Age machine machine case, pulley case machine, support of various rollers and bed manufacturing & assembly |
|