Pulp & Paper

Pull & Paper

2016Miscellaneous mechanical installations
2008-2015In the paper production line installation, piping project designing, manufacturing and montage, static calculation, steel construction and complex plant machine assembly works. 
2014Within the capacity increase project; dearation tank white water, stand pipe reject cleaner 1 st. stage, machine chest 2 (former wastewater storage), white water I ve  II, enboard Department pipeline renovations, stainless pneumatic piping work, metal separator to be placed on sorter outlets, glue tank manufacturing
2016Miscellaneous mechanical installations 
2010-20112. paper line stainless pipe installation, support, dust suction channels, manufacture and installation of stainless paste-air-water lines, fan-coil, steam, lines installation 
2005-2006Hydraulic and pneumatic lines, steel constructions, instrument assemblies, waste collection tanks
2016Various mechanical installations, welding works within the scope of OHS, arrangement of open warehou area and replacement of roof gutters
2005-2015Mechanical maintenance and pipe repair work
2014Within the scope of KM2 capacity increase project (from 100.000 t to 160.000 t); Assembly of individual pipes, assembly all pipes (dough, water, oil, air and auxiliary facilities), erosion of water removal eq be uipments, shoe press erection, new hau erection, triple desing drying cylinders aligment and montage, GAW surface preparation system montage , Sigma package packaging line revision, solid waste disposal system (Celtec & Meri) within the scope of the necessary manufacturing and assembly works, new treatment plant manufacturing ve komple montajı, 14 adet muhtelif büyüklükte tank, 2 adet pulper ingimalat ve montajı, tüm havalandırma kanal imalat ve montajları, boru ve kanal izolasyon işleri, ip sevk sistemi&web thread sistemi montajı 
20111-2-3-4 upgrading of the turbine busses, replacement of the roof of the archive building, replacement of crew and mess hall gutters, making the KM1 haube exit chimneys compatible with the ø900, ø630, ø450 legal conditions, 
2009Within the scope of KM 1 capacity increase project, mechanical installation and piping works, new haube installation, KM1 capacity increase project; Shoe press installation, steam condenser system revision, ventilation                     manufacturing and installation of ducts, renewal of fire lines, various steel constructions, various insulation works, dough and water tanks, pulp manufacturing
2005

Steel construction, production and installation of steam pipelines 

2016 Various mechanical installation and maintenance works 
2014 - 2015 Factory general stainless pipe work, mechanical, hydraulic maintenance work 
20055 disc filter housing manufacturing and assembly
2007Placement and technical design of vacuum pumps, preparation of pipe isometric project
2016Projecting of personnel fire exit platforms within the scope of the ISG
2015-2016Mechanical maintenance and technological piping works
2015Tire factory factory general insulation renovation project 
2010-2015Factory general mechanical and pipe maintenance work
2012Steam condensate line manufacturing and installation, KM1 ventilation system equipment installation, 
2010

Dough preparation part revision work

2010-2015Factory general pipe manufacturing and erection, electrical maintenance, mechanical maintenance and repair works
2012KM1 gres ve sıvı yağlama hidrolik tesisatı