| 2016 | Miscellaneous mechanical installations | 2008-2015 | In the paper production line installation, piping project designing, manufacturing and montage, static calculation, steel construction and complex plant machine assembly works. | 2014 | Within the capacity increase project; dearation tank white water, stand pipe reject cleaner 1 st. stage, machine chest 2 (former wastewater storage), white water I ve II, enboard Department pipeline renovations, stainless pneumatic piping work, metal separator to be placed on sorter outlets, glue tank manufacturing |
|
| 2016 | Miscellaneous mechanical installations | 2010-2011 | 2. paper line stainless pipe installation, support, dust suction channels, manufacture and installation of stainless paste-air-water lines, fan-coil, steam, lines installation | 2005-2006 | Hydraulic and pneumatic lines, steel constructions, instrument assemblies, waste collection tanks |
|
| 2016 | Various mechanical installations, welding works within the scope of OHS, arrangement of open warehou area and replacement of roof gutters | 2005-2015 | Mechanical maintenance and pipe repair work | 2014 | Within the scope of KM2 capacity increase project (from 100.000 t to 160.000 t); Assembly of individual pipes, assembly all pipes (dough, water, oil, air and auxiliary facilities), erosion of water removal eq be uipments, shoe press erection, new hau erection, triple desing drying cylinders aligment and montage, GAW surface preparation system montage , Sigma package packaging line revision, solid waste disposal system (Celtec & Meri) within the scope of the necessary manufacturing and assembly works, new treatment plant manufacturing ve komple montajı, 14 adet muhtelif büyüklükte tank, 2 adet pulper ingimalat ve montajı, tüm havalandırma kanal imalat ve montajları, boru ve kanal izolasyon işleri, ip sevk sistemi&web thread sistemi montajı | 2011 | 1-2-3-4 upgrading of the turbine busses, replacement of the roof of the archive building, replacement of crew and mess hall gutters, making the KM1 haube exit chimneys compatible with the ø900, ø630, ø450 legal conditions, | 2009 | Within the scope of KM 1 capacity increase project, mechanical installation and piping works, new haube installation, KM1 capacity increase project; Shoe press installation, steam condenser system revision, ventilation manufacturing and installation of ducts, renewal of fire lines, various steel constructions, various insulation works, dough and water tanks, pulp manufacturing |
|
| 2005 | Steel construction, production and installation of steam pipelines |
|
| 2016 | Various mechanical installation and maintenance works | 2014 - 2015 | Factory general stainless pipe work, mechanical, hydraulic maintenance work | 2005 | 5 disc filter housing manufacturing and assembly |
|
| 2007 | Placement and technical design of vacuum pumps, preparation of pipe isometric project | |
|
| 2016 | Projecting of personnel fire exit platforms within the scope of the ISG | 2015-2016 | Mechanical maintenance and technological piping works | 2015 | Tire factory factory general insulation renovation project | 2010-2015 | Factory general mechanical and pipe maintenance work | 2012 | Steam condensate line manufacturing and installation, KM1 ventilation system equipment installation, | 2010 | Dough preparation part revision work |
|
| 2010-2015 | Factory general pipe manufacturing and erection, electrical maintenance, mechanical maintenance and repair works | 2012 | KM1 gres ve sıvı yağlama hidrolik tesisatı |
|