| 2014-2015 | 70 ton steel construction projecting, manufacturing and assembly | 2013 | Galvanizing sheet work | 2005-2011 | Manufacture and installation of pipes, steel constructions, conveyors, cyclone suction lines of NPK1, NPK2 and | 2010 | TSP unitsNPK1 wash tower steel construction, projecting, manufacturing and erection |
|
| 2016 | Oven 3 Process Water Line Renewal Project | 2015 | WHR unit pipeline modification, mud drier heat exchanger manufacture and modification, high pressure pipeline work between tower and oven 3 pump stations | 2014 | Manufacture and installation of 150 m³ double-walled ammonia tank, design-manufacture-erection and etank-tower installations under the revision SNCR system of the WHR plant transmiter lines with AISI316 pipe | 2013 | Sludge drying plant chimney-side heat exchanger disassembly-erection, insulation and pipeline work | 2012 | Manufacture and installation of factory wide fire lines | 2011 | Revision of fuel oil lines | 2008-2009 | Sludge drying line, 1500 m. 6 '' hot oil line manufacturing and installation, insulation works | 2006-2007 | Manufacture, installation and isolation of silo pipelines, silo fans |
|
| 2015 | Manufacture and installation of 150 m³ single-walled ammonia tank design-manufacturing-installation and tank-tower installations under the SNCR system | 2017 | Akçansa Ambarlı Cement Terminal, Pipeline Renewal Project |
|
| 2015 | As the main contractor; Manufacture, installation and isolation of the complex industrial plant of the plant including material (~ 40,000 m) | 2015 | Design and manufacturing of 200 m³ double-walled ammonia tank under the SNCR system, installation and assembly of tank-tower installations | 2013 | Well waterway manufacturing and assembly work |
|
| 2017 | Manufacturing and erection of 110 m3 Ammonia Tank in the scope of SNCR System and assembly and assembly of tank-preheater towers |
|
| 2016 | Manufacturing and erection of 100 m3 Ammonia Tank within the scope of SNCR System and assembly and assembly of tank-preheater towers | 2016 | Packaging 1-2-3-4 Fire Line Manufacturing and Installation |
|
| 2016 | Subcontractor of Bilim Makine A.Ş; Fabrican complex; (~ 25.000 m) production and supply of cooling water lines, fuel-oil and hot oil lines, steam and condensate lines, fire lines, air lines |
|
| 2016 | 25m³ / h Sand Filtration and installation of equipment and system installation works |
|