| 2016 | Within the scope of commissioning of the new presses, the production and installation of hot oil, steam and air installations of the system and the construction of insulation | 2005-2015 | Gölcük and Gebze factories, hot oil lines, machine assembly, ventilation, steel construction works and insulation works | 2014 | Logging press works | 2013 | Dismantling of facilities in Gölcük Ford complex and Aygen, cooling water line installation shelter and basement ventilation installations | 2012 | HMP3 2nd line installations, factory exhaust chimney outlets modification | 2011 | 400 ton prese buhar hattı imali ve montajı |
|
| 2012 | Modification of paint house roof in Hyundai plant, manufacture and erection of exhaust lines of extension kilns, coating of cabins with sandwich panel |
|
| 2013 | Dismantling of steel shelves in facilities in Ford complex |
|
| 2014 | Şekerpınar (Taysad) factory The revision of the Tofaş casks |
|
| 2005 | Fabrication and erection of factory steel construction works |
|
| |
| 2011 | Pigment room modification work, factory general miscellaneous maintenance work |
|
| 2012 | Closing of Mpr 12/13 press floors in the press section at Ford otosan Gölcük plants | 2011 | Dyehouse modification works |
|
| 2014 | DÜRR Germany; Within the capacity increase project; HAOS CC, BC, primer cabin suspension system and mon HAOS Dyehouse and robot chassis modifications & modification of ventilation systems | 2013 | DÜRR Germany; Within the capacity increase project; Robot base plate works, cabin reinforcement works, strengthening of paint floor platform and strengthening of cabin suspension system | 2013 | DÜRR Korea; Assembly, assembly and commissioning of the plant within the scope of RTO System |
|
| 2014 | RTO dismantling work, installation of reverse rinsing unit for plate exchangers of Pt line degreasing 1 and 2 tank | 2013 | Within the capacity increase project; Water test pool magnetic filter installation, fire collector overhaul, wastewater pools pipe and equipment revision, air compressors and pipe replacement, additional engine installation in paint house elevators | 2012 | 04 nolu turn table production | 2006 | Paint shop robots installation, installation and erection of installations |
|
| 2016 | Within the scope of the new factory investment, the production and installation of hot oil, steam, air and water installations and insulation construction project of the plant |
|
| 2016 | Production and installation of complex compressed air lines and cooling water lines of the plant (2016) |
|
| 2015-2016 | Miscellaneous mechanical maintenance and industrial installation works (2015-16) |
|