| 2015-2016 | Within the scope of MDF 2 Investment; Boiler piping chemical plant additional fire extinguishing system, glue reactors cooling water system, chemical plant melamine supply line production and installation | 2016 | Production and Installation of Stainless Bunker in the context of Melamine Feeding System | 2011-2015 | Mechanical maintenance work | 2015 | Boiler tank piping, Chiller pipeline revision, Mdf2 boiler internal piping, Mdf pipeline piping modification | 2014 | Mdf2 shaken sieve disassembly and assembly, treatment plant piping works | 2013 | Within the capacity increase project; Dismantling of old glue plant mechanical system, replacement of cooling tower, Cover-3 fire system, pressurized air system, hot oil line, coating fire line additional hose mouth and fire cabinet erection works, drying fiber elbow outlet pipe production, impregnation 2 fire and air lines, eco resinazor steam line, hot oil waiting tank 10 M³, chemical plant pilot reactor piping, acid caustic tanks pipeline installation, methanol fire pumps water tank construction 1 m³ | 2012 | Rifayner steam lines, control room ventilation system production and installation of filter | 2010 | The control room of the Mdf3 facility and the administrative sections the ventilation system | 2008-2005 | Manufacture and installation of hot oil pipelines, manufacture and erection of stainless steel pipelines, assembly of pump groups, conveyor manufacturing and drum coating |
|